Corvallis School District

Size:
150 kW
Date Installed:
April 1, 2020

Our 150 kW solar array at the Corvallis School District offices, installed by BE Solar in March 2020, is the first Solarize Corvallis project, a collaboration between the Oregon Clean Power Co-op and the Corvallis Sustainability Coalition. 

The system was designed to allow the District to add batteries to the solar array, which will provide emergency backup power to keep the District’s computer and communications systems running in case a natural disaster shuts down the power grid.